From processing to production —
the SeoRim Steel story

2024

OCTOBER

Acquired a galvanizing line
and color coating line plant

The turning point that took us from coil processing to producing steel sheet ourselves.

CGL 150,000 t/yr CCL 100,000 t/yr
SeoRim Steel Suncheon Plant

Milestones

  1. 2024.10

    Acquired CGL & CCL plant

    SeoRim Steel acquired the continuous galvanizing line (CGL) and continuous coating line (CCL) at the Suncheon Plant, expanding from coil processing into direct steel sheet production. The company now has an annual capacity of 150,000 tons (CGL) and 100,000 tons (CCL).

    SeoRim Steel Suncheon Plant continuous galvanizing line (CGL)
  2. 2018

    Large shearing line installed

    With a large shearing line, SeoRim Steel became able to cut wide sheets with precision, further strengthening its sheet processing capability and supply capacity.

    SeoRim Steel large shearing line
  3. 2011

    Mini shearing line installed

    A mini shearing line extended the business from slitting to sheet cutting, laying the foundation to respond quickly to small-lot, multi-item orders.

    SeoRim Steel mini shearing line
  4. 2008.07

    Large slitting line installed

    A large slitting line greatly increased the range of coil sizes and volumes the company could handle, establishing full capability to slit coils precisely to customers' required widths.

    SeoRim Steel large slitting line
  5. 2006.04

    SeoRim Steel founded · small slitting line installed

    SeoRim Steel Co., Ltd. was founded and began coil slitting with a small slitting line, taking its first step as a specialized steel processing company.

    SeoRim Steel mini slitting line